7 AM to 11 PM, seven days

+971 58 541 4616info@taxadvisors.ae

TaxAdvisors

Learn

Target Costing vs Cost-Plus Pricing: Price-Led Profit Planning

Target costing vs cost-plus pricing explained with a UAE contracting tender example: the target-cost equation, value engineering and lifecycle costing.

what is target costing with example?

Target costing starts from the market: target cost equals target price minus target profit, and the business engineers the product down to that cost. Cost-plus starts from the cost: price equals cost plus a markup. In competitive markets, cost-plus prices you out of work or into losses, because the market sets the price regardless of your costs. Target costing's discipline — designed in Japan's automotive industry — forces cost out during design, when 80% of lifetime cost is committed.

Basis: IFRS Foundation

Target cost equation
Target cost = target (market) price - target profit margin
Horngren's Cost Accounting — target costing (textbook convention)
Cost-plus equation
Price = cost base + markup on that base
Horngren's Cost Accounting — pricing (textbook convention)
Design-phase leverage
Most of a product's lifetime cost is committed during design
Target costing literature — design-phase cost commitment (textbook convention)
Value engineering aim
Achieve required functions at target cost without sacrificing quality
Horngren's Cost Accounting — value engineering (textbook convention)
Kaizen costing
Continuous cost reduction during manufacturing to meet targets
Horngren's Cost Accounting — kaizen costing (textbook convention)
Lifecycle view
Target costing considers total cost of ownership, not just production cost
Horngren's Cost Accounting — lifecycle costing (textbook convention)

# Price-led vs cost-led: the fundamental reversal

Every pricing method answers the same question — what should we charge? — but from opposite ends. Cost-plus starts with your cost, adds the margin you want, and presents the total to the market as the price: price = cost + markup. Target costing starts with the market's price, subtracts the margin you need, and presents the remainder to your engineers as the cost they must achieve: target cost = target price − target profit. The difference is who adapts: under cost-plus, the customer is expected to adapt to your costs; under target costing, your costs adapt to the customer's price. In competitive markets only the second is viable, because the market does not read your cost sheet. The running example is Meridian Fit-Out, a Dubai interior contracting firm tendering for a 2,000 m² office fit-out. Market intelligence — recent awards, quantity-surveyor benchmarks, the client's budget signals — puts the winning price around AED 3.2 million. Meridian's board requires a 12% margin on contract value (AED 384,000) to cover head-office costs and risk. The target cost is therefore AED 2,816,000, or AED 1,408 per m². That number now governs every design and procurement decision on the tender. If the current estimate comes in at AED 3.05 million, there is a AED 234,000 gap to close through value engineering — or Meridian walks away, because bidding at cost-plus and hoping is how contractors go broke.

# Finding the target price: market research that matters

The target price is the load-bearing estimate — everything follows from it, so it must be grounded. For Meridian's tender, the inputs are: the client's stated budget and its credibility, recent comparable awards (three similar fit-outs awarded at AED 1,520–1,650/m² in the last year), the competitive field (four bidders, two known for aggressive pricing), and the value proposition Meridian can defend (faster programme, premium finishes — worth perhaps 3–5% over the cheapest bidder). The target price of AED 3.2 million (AED 1,600/m²) reflects a judgement: competitive enough to win, high enough to sustain the margin if the target cost is achieved. Techniques vary by industry: conjoint analysis and price-sensitivity surveys for consumer products, competitor teardown and benchmarking for manufactured goods, comparable-award analysis for contracting. The common discipline is that the target price is a market fact to be discovered, not an internal aspiration to be declared — finance teams that let optimism set the target price ('we can surely get 1,750') build the whole costing exercise on sand. Sensitivity analysis belongs here: if the winning price turns out to be AED 3.05 million, the target cost falls to AED 2,684,000 and the gap nearly doubles. Knowing the break-even target price — the price below which the project cannot work — tells Meridian its walk-away point before the tender consumes weeks of estimating effort.

Target costing works backwards: AED 3,200,000 market price minus AED 384,000 required margin equals AED 2,816,000 target cost An equation of three boxes: target price AED 3,200,000 minus target profit AED 384,000 equals target cost AED 2,816,000, with the design phase noted as where cost is committed. Price first, cost second — the fit-out tender Target price 3,200,000 − Target profit 384,000 = Target cost 2,816,000 The market sets the price; the required margin sets the cost. Design and procurement must deliver at or below AED 2,816,000 (AED 1,408/m²) — most lifetime cost is committed in design. Cost-plus does the reverse: cost + markup = price — and hopes the customer agrees.
Target costing subtracts the required AED 384,000 margin from the AED 3,200,000 market price, leaving a AED 2,816,000 target cost that design and procurement must hit. Cost-plus pricing starts from cost and hopes the market follows.

# The target profit: strategy, not greed

The target margin subtracted from the price is a strategic requirement, not a negotiating aspiration. It must cover what the project owes the business: the return on capital employed in delivery, the head-office and financing costs the project will absorb, the risk premium for the contract's specific risks (client payment history, programme penalties, ground conditions), and the strategic value of the work (a flagship client may justify a thinner margin; a distraction project demands a thicker one). Meridian's 12% reflects its cost of capital, its Dubai head-office overhead, and a risk premium for a client with slow-payment history — documented, not plucked from the air. Two disciplines keep the target profit honest. First, it should be set by policy and applied consistently, not negotiated per tender by an estimator under pressure to win work — the margin is the board's decision. Second, it should be expressed on the right base: margin on revenue for commercial clarity, but checked against return on the capital the project will tie up (bonds, retentions, working capital), because a 12% margin on a project that locks up cash for eighteen months may be a poor return. The target-cost equation then does its work: AED 3,200,000 − AED 384,000 = AED 2,816,000 of allowable cost, allocated across work packages — joinery, MEP, finishes, preliminaries — each with its own sub-target.

# Closing the gap: value engineering in practice

Meridian's current estimate is AED 3,050,000 against the AED 2,816,000 target — a AED 234,000 gap, about 8%. Value engineering closes it without sacrificing what the client values, through functional cost analysis: for each element, what function does it serve, what does it cost, and is there a cheaper way to deliver the same function? The joinery package (AED 680,000 estimated vs AED 620,000 target): standardise the workstation modules from seven types to three — same appearance, fewer setups, AED 45,000 saved. The lighting package: substitute the specified Italian fittings with a UAE-assembled equivalent meeting the same lux and CRI specifications — client-approved equal, AED 60,000 saved. MEP: reroute ductwork through the corridor bulkhead instead of bespoke ceiling coffers — AED 55,000 of labour and material saved with no visible difference. Preliminaries: compress the programme by two weeks through overlapping trades — AED 40,000 of site overhead saved. Procurement: aggregate stone and tile orders with the concurrent JVC project for volume discounts — AED 34,000. Total: AED 234,000 — gap closed, design intent preserved. Note what value engineering is not: it is not cheapening (thinner stone that stains, cheaper paint that peels — the external failure costs will exceed the saving), and it is not post-contract cost-cutting (which breeds disputes). Done pre-tender, it is design optimisation; done post-award, it is margin recovery. The discipline requires the estimator, designer and project manager in one room with the target costs per package — organisationally, that is the hard part.

# Cost-plus pricing: the mechanics and the failure

Cost-plus is simple: estimate the cost, add a markup. Meridian's traditional approach on smaller jobs: direct costs plus 35% for overhead and profit. On the office tender, cost-plus on the AED 3,050,000 estimate gives AED 4,117,500 — AED 900,000 above the market price, a bid that loses. Alternatively, cost-plus on a stripped estimate might undercut the market and win the job at a margin the business cannot sustain. Three structural flaws doom cost-plus in competitive markets. First, it ignores demand: the price reflects your costs, not what the customer will pay. Second, the 'cost' base is usually a full cost including allocated fixed overhead, which depends on volume assumptions — the death-spiral mechanics from the overhead-variances page: low volume raises the rate, raises the price, lowers volume further. Third, it rewards inefficiency: every dirham of waste becomes a dirham of cost-plus price, so the estimator has no incentive to engineer costs down — the opposite of target costing's discipline. Cost-plus survives where these flaws do not bite: genuinely bespoke work with no market comparator, cost-reimbursement contracts where the client explicitly pays cost plus a fee, and regulated pricing. Even there, the wise client audits the 'cost' base for efficiency — which is target costing by another name.

# Kaizen costing: the production-phase companion

Target costing designs cost out before production; kaizen costing squeezes it out during production through continuous incremental improvement. The Japanese model sets annual cost-reduction targets per product — say 3% — and production teams deliver them through hundreds of small changes: a jig that cuts assembly time, a renegotiated consumable, a layout tweak that shortens material handling. For Meridian, kaizen is the site-phase equivalent: the project team holds a weekly cost review against the package targets, and every saving — a better cutting pattern for stone, returning unused hired equipment a day early, resequencing to reduce crane days — is banked against the target. The cultural requirements are real: workers must be empowered to suggest changes, suggestions must be implemented visibly and quickly, and savings must be recognised rather than absorbed into next year's tougher target without acknowledgement (the ratchet effect kills kaizen). Kaizen costing also disciplines the 'we'll make it up on site' optimism of estimators: the target cost assumes the kaizen improvements will happen, so the production system must be capable of delivering them. In UAE contracting, where margins are thin and variations are the traditional profit source, kaizen is the alternative to the adversarial variation game — profit from efficiency rather than from claims.

# Lifecycle costing: the total-cost view

Target costing's horizon extends beyond production to the product's whole life: design, manufacture, distribution, use, maintenance and disposal. For Meridian's fit-out, the lifecycle includes the client's operating costs — energy consumption of the specified lighting and HVAC, maintenance access, churn costs when teams reorganise — and Meridian's own defect-liability exposure. A value-engineering proposal that saves AED 60,000 on lighting but doubles the client's energy bill fails the lifecycle test and, with sophisticated clients, fails the tender's value assessment. Lifecycle costing quantifies these trade-offs: the net present value of operating and maintenance costs over the fit-out's life, discounted appropriately, set against the capital saving. It also governs Meridian's own long-run economics: the defect-liability period, the latent-defects exposure, and the working-capital cost of retentions held for a year. In manufacturing, lifecycle costing is most visible in capital goods — the machine that costs more to buy but less to run — and in the growing regulatory attention to end-of-life costs. The management accountant's contribution is to insist the analysis covers the whole life: tender decisions made on capital cost alone are the commercial equivalent of the relevant-costing fallacy, counting what is visible and ignoring what is large.

# When the gap will not close: redesign or walk away

Sometimes value engineering cannot reach the target: the gap is structural, not waste. Meridian faces this on a second tender — a heritage-building refurbishment where conservation constraints fix the materials and methods, the target cost is AED 1.9 million, and the honest estimate will not go below AED 2.2 million. The disciplined responses, in order: redesign the offering (propose a reduced scope that fits the target — fewer bespoke elements, phased delivery); renegotiate the commercial terms (a longer programme that cuts preliminaries, client-supplied materials); and if neither works, walk away. Walking away from revenue is the hardest decision in business and the most valuable discipline target costing teaches: a contract won below target cost is a loss contracted in advance, consuming management attention and bonding capacity that profitable work needs. The estimating database should record the walk-away with its reasons — next year's tender for a similar building starts from knowledge, not hope. Boards should track the win rate at target margins as a KPI: a 100% win rate means the targets are too soft or the estimators are bidding below them; a healthy business wins a fraction of its tenders at sustainable margins and loses the rest to competitors who will discover the costs the hard way.

# Target costing and the bid/no-bid discipline

The target-cost equation doubles as a bid/no-bid screen that saves the scarcest resource in contracting: estimating time. Before a full estimate is built, the commercial team runs the quick test — credible target price, board margin, resulting target cost against a parametric benchmark from the job-history database (AED per m2 for this fit-out type, adjusted for known factors). If the target cost is 15% below anything the firm has ever achieved, the honest answer is usually no-bid, and the team moves to the next opportunity instead of spending three weeks proving it. Firms that bid everything estimate nothing well; firms that screen ruthlessly estimate the shortlisted tenders properly and win them at sustainable margins. The screen also disciplines the pipeline conversation with the board: instead of 'we need more revenue', the discussion becomes 'we need more opportunities that fit our target-cost capability' — a strategically different business.

# Keep reading

Target costing sets the long-run price discipline; relevant costing handles the short-run tactical decisions the target cannot pre-empt. The joint-products page applies target thinking to split-off decisions, and CVP analysis provides the volume-profit mechanics behind the target price.

Sources and legal basis

Terms used8

  • Target cost
  • Value engineering
  • Cost-plus pricing
  • Lifecycle costing
  • Kaizen costing
  • Functional cost analysis
  • Tender pricing
  • Design-to-cost
  1. IAS 2 InventoriesIFRS Foundation
  2. CIMA — Management Accounting GuidanceCIMA

Rates, thresholds and deadlines change. Every figure above is linked to the authority that publishes it — if the two ever disagree, the authority is right and this page is out of date. Tell us and we will fix it.

FAQ Answers to the questions people actually ask

Frequently asked questions

What is target costing in simple terms?

Price-led costing: find what the market will pay, subtract the profit you need, and the remainder is the cost you must achieve — then design the product to hit it. It reverses the traditional logic of costing the product and adding a margin, and it forces cost discipline into the design phase where costs are actually determined.

What is the target costing formula?

Target cost = target selling price − target profit margin. If the market pays AED 500 and you need a 20% margin (AED 100), the target cost is AED 400. The current estimated cost is then compared to AED 400, and value engineering closes the gap — or the product is redesigned or dropped.

How is target costing different from cost-plus pricing?

Cost-plus starts from your cost and adds a markup — the market is assumed to accept the result. Target costing starts from the market price and works backwards to the allowable cost — your costs must fit the market. Cost-plus is cost-led; target costing is price-led. In competitive markets only the second survives.

What is value engineering?

A systematic review of product design and production methods to achieve the required functions at the target cost: substituting materials, simplifying parts, standardising components, redesigning processes. It asks of every feature 'what does the customer value, and what does it cost?' — and removes cost that customers will not pay for.

What are the steps in target costing?

Determine the target price from market research; set the target profit from strategic requirements; compute the target cost; estimate the current cost; identify the gap; use value engineering and supplier collaboration to close it; then use kaizen costing for continuous reduction during production. If the gap cannot be closed, redesign or abandon.

What is kaizen costing?

The Japanese practice of continuous, incremental cost reduction during the manufacturing phase — small improvements by production teams that compound over time. Where target costing designs cost out before production, kaizen costing squeezes it out during production. Together they cover the product's whole life.

Why does cost-plus pricing fail in competitive markets?

Because the market sets the price, not your cost sheet. Cost-plus either overprices (your costs are above market — you win no work) or underprices (your costs are below market — you leave money on the table). Worse, allocating fixed costs into the 'cost' base makes the price depend on volume assumptions, creating the death spiral of raising prices as volume falls.

When is cost-plus pricing acceptable?

Where there is no market price to start from: genuinely custom work, cost-reimbursement government contracts, regulated utilities, and one-off jobs with unique specifications. Even there, the 'cost' base should be the efficient cost — otherwise cost-plus rewards inefficiency by converting waste into a higher price.

What is lifecycle costing?

Considering all costs from design through disposal — R&D, production, distribution, warranty, operating costs for the customer, end-of-life. Target costing uses the lifecycle view because design decisions lock in downstream costs: a cheaper component that doubles warranty claims is not a saving. It is essential for capital goods and construction.

Does target costing work in services and construction?

Yes — the logic is general. A contractor's tender has a market price (the winning bid level), a required margin, and therefore a target cost the project must be delivered for; value engineering becomes design optimisation and procurement strategy. Professional services use it implicitly when fixed-fee engagements are scoped to fit the fee.

Ask

Have a question this page did not answer?

Every rule on this page is published free, with the instrument it rests on, so you can act on it yourself. When you would rather hand it over, the three channels opposite reach a person directly.

Need to discuss this?

Text us, or call now

If you want guidance on your own position rather than the general rule, send a text or call. You get a person, not a ticket, any time between 7 am to 11 pm, seven days. Say what your licence is and what the deadline is and you will usually have an answer in the same conversation.

Call +971 58 541 4616 Text us on WhatsApp Email us